build-log / experiments

I test before I say “fixed”.

I record what I built, what I actually ran and what those results still leave unanswered.

I freeze expected behavior first. REPRO must reproduce the original failure, then test a patch against the same assertions.

I keep implemented code distinct from completed runs. A passing target test covers only the cases listed.

01 / IMPLEMENTATION

What I built

How I separate expected behavior, the original failure, a candidate patch and the test verdict.

02 / CONTROLLED RUN

What I have actually tested

A controlled fixture run checked the sandbox harness; no Groq request was made.

03 / SITE NOTES

How I make the work easier to inspect

I record how the site presents the story, source code and project evidence.

Inspect the actual commit history ↗